nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Diagram Information and Instructions|Page 1931 > < Diagram Information and Instructions|Page 1929
Page 14
background image

Checking Equipment 

NOTE:

-

The CONSULT-II must be used in conjunction with a program card. CONSULT-II does not require loading (Initialization) procedure.

-

Be sure the CONSULT-II is turned off before installing or removing a program card.

CAUTION:

-

If CONSULT-II is used with no connection of CONSULT-II CONVERTER, malfunctions might be detected in self-diagnosis depending on
control unit which carry out CAN communication. 

-

If CONVERTER is not connected with CONSULT-II, vehicle occur the "FAIL SAFE MODE" which is "LIGHT UP the HEAD LIGHT" and/or
"COOLING FAN ROTATING" when CONSULT-II is started. 

-

Previous CONSULT-II "I" and "Y" DLC-I and DLC-II cables should NOT be used anymore because their DDL connector pins can be damaged
during cable swapping.

NOTE:  The DDL1 and DDL2 circuits from DLC pins 12, 13, 14 and 15 may be connected to more than one system. A short in a DDL circuit connected
to a control unit in one system may affect CONSULT-II access to other systems.

CONSULT-II Start Procedure

1. Turn ignition switch OFF.

2. Connect CONSULT-II and CONSULT-II CONVERTER to the data link connector.
3. Turn ignition switch OFF.

4. Touch "START (NISSAN BASED VHCL)" or "System Shortcut" (eg: ENGINE) on the screen.

Diagram Information and Instructions|Page 1931 > < Diagram Information and Instructions|Page 1929