nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Power Rack & Pinion|Page 3829 > < Power Rack & Pinion
Page 2
background image

^

Install pipe connector.

^

Observe specified tightening torque when tightening high-pressure and low-pressure pipe connectors. Excessive tightening will damage threads
of connector or 0-ring.

^

The 0-ring in low-pressure pipe connector is larger than that in high-pressure connector. Take care to install the proper 0-ring.

Connector tightening torque:

Low-pressure side "1" 21 - 39 N (2.8 - 4.0 kg, 20 - 29ft-lb)
High-pressure side "2" 15 - 25 N (1.5 - 2.5 kg, 11 - 18ft-lb)

^

Initially, tighten nut on tie-rod outer socket and knuckle arm to 29 to 39 N (3 to 4 kg, 22 to 29 ft-lb). Then tighten further to align nut groove
with first pin hole so that cotter pin can be installed.

CAUTION:  Tightening torque must not exceed 49 N (5kg, 36ft-lb).

^

Before removing lower joint from gear, set gear in neutral (wheels in straight-ahead position). After removing lower joint, put matching mark
on pinion shaft and pinion housing to record neutral position of gear.

^

To install, set left and right dust boots to equal deflection, and attach lower joint by aligning matching marks of pinion shaft and pinion
housing.

^

Tighten gear housing mounting bracket bolts in the order shown.

Power Rack & Pinion|Page 3829 > < Power Rack & Pinion