Pathfinder 2WD V6-2960cc 3.0L SOHC (VG30i) (1989)
ILL. 9
NISSAN PATHFINDER EXTERIOR TIRE MOUNT INSTALLATION INSTRUCTIONS
5.
FRAME AND SADDLE
a)
Get a helper to hold the frame up to the vehicle in the fully open position. (See ILL. 9). Install all eight long 10 mm mounting bolts and
torque to 20-27 ft.lbs.
b)
Mount the saddle to the frame with four short 10 mm bolts. Torque to 20-27 ft.lbs.
c)
Replace finishers C, B and A in that order. (Ref. ILL. 1)
ILL. 10
6.
FINAL ADJUSTMENT
a)
Position guide as shown. (See ILL. 10)
b)
Torque guide and striker mounting bolts to 20-27 ft.lbs.
c)
Check fire mount for proper operation. (open/close)
d)
If tire mount rattles in closed position, lower the striker 1 mm and check again. Repeat as necessary.