nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Cooling System|Capacity Specifications|Page 1671 > < Cooling System|Capacity Specifications|Page 1669
Page 3
background image

6. Install an air hose to the venturi assembly, the air pressure must be within specification.

CAUTION:
The compressed air supply must be equipped with an air dryer.
7. The vacuum gauge will begin to rise and there will be an audible hissing noise. During this process open the ball valve on the refill hose slightly.

Coolant will be visible rising in the refill hose. Once the refill hose is full of coolant, close the ball valve. This will purge any air trapped in the
refill hose.

8. Continue to draw the vacuum until the gauge reaches 28 inches of vacuum. The gauge may not reach 28 inches in high altitude locations, use the

vacuum specifications based on the altitude above sea level.

9. When the vacuum gauge has reached the specified amount, disconnect the air hose and wait 20 seconds to see if the system loses any vacuum. If

the vacuum level drops, perform any necessary repairs to the system and repeat steps 6 - 8 to bring the vacuum to the specified amount. Recheck
for any leaks.

10. Place the coolant container (with the refill hose inserted) at the same level as the top of the radiator. Then open the ball valve on the refill hose so

the coolant will be drawn up to fill the cooling system. The cooling system is full when the vacuum gauge reads zero.

Cooling System|Capacity Specifications|Page 1671 > < Cooling System|Capacity Specifications|Page 1669