Pathfinder 2WD V6-4.0L (VQ40DE) (2009)
INSTALLATION
Installation is in the reverse order of removal. Note the following:
Intake Manifold Collector
-
If stud bolts were removed from intake manifold, install them and tighten to the specified torque.
-
Tighten nuts and bolts in numerical order as shown.
Electronic Throttle Control Actuator
-
Tighten bolts in numerical order as shown.
-
Perform the "Throttle Valve Closed Position Learning" when harness connector of electronic throttle control actuator is disconnected. Refer to
See: Powertrain Management/Computers and Control Systems/Testing and Inspection/Programming and Relearning/Throttle Valve Closed
Position Learning.
-
Perform the "Idle Air Volume Learning" and "Throttle Valve Closed
Position Learning" when electronic throttle control actuator is replaced. Refer to See: Powertrain Management/Computers and Control
Systems/Testing and Inspection/Programming and Relearning/Idle Air Volume Learning.