Pathfinder 2WD V6-40L (VQ40DE) (2009) Engine Timing Chain Exploded View
Front oil pan bolt torque : 22.0 N.m (2.2 kg-m, 16 ft-lb)
15. Install right and left intake valve timing control covers as follows:
a. Install new seal rings in shaft grooves.
b. Apply a continuous bead of liquid gasket using Tool to intake valve timing control covers as shown.
Tool number : WS39930000 ( - )
Use Genuine RTV Silicone Sealant or equivalent. Refer to See: Specifications/Fluid Type Specifications.
c. Install new collared O-rings in front timing chain case oil hole (left and right sides).
d. Being careful not to move seal ring from the installation groove, align dowel pins on front timing chain case with the holes to install intake
valve timing control covers.
e. Tighten bolts in numerical order as shown.
16. Install crankshaft pulley as follows:
a. Install crankshaft pulley, taking care not to damage front oil seal.
-
When press-fitting crankshaft pulley with plastic hammer, tap on its center portion (not circumference).
b. Tighten crankshaft pulley bolt in two steps.