nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Exploded View|Page 1649 > < Exploded View|Page 1647
Page 3
background image

NOTE:
Do not reuse O-rings.

INSPECTION AFTER REMOVAL
-

Visually check that there is no significant dirt or rust on the water pump body and vane.

-

Make sure there is no looseness in the vane shaft, and that it turns smoothly when rotated by hand.

-

Replace water pump, if necessary.

INSTALLATION
1. Install new O-rings to water pump.

NOTE:
-

Apply engine oil to O-rings.

-

Locate O-ring with white paint mark to engine front side.

2. Install water pump.

CAUTION:
Do not allow timing chain case to pinch O-rings when installing water pump.
-

Make sure that timing chain and water pump sprocket are engaged.

-

Insert water pump by tightening bolts alternately and evenly.

3. Install timing chain tensioner (primary) as follows:

a. Remove dust and foreign material completely from backside of timing chain tensioner (primary) and from installation area of rear timing chain

case.

b. Turn crankshaft pulley clockwise so that timing chain on the timing chain tensioner (primary) side is loose.
c. Install timing chain tensioner (primary) with its stopper pin attached.

CAUTION:
Be careful not to drop bolts inside timing chain case.

Exploded View|Page 1649 > < Exploded View|Page 1647