nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 5606 > < Initial Inspection and Diagnostic Overview|Page 5604
Page 1
background image

Audible Warning Device: Component Tests and General Diagnostics

Combination Meter

POWER SUPPLY AND GROUND CIRCUIT

COMBINATION METER : Diagnosis Procedure

1.CHECK FUSES
Check for blown combination meter fuses.

Is the inspection result normal?
YES >> GO TO 2
NO >> If fuse is blown, be sure to eliminate cause of malfunction before installing new fuse.
2.POWER SUPPLY CIRCUIT CHECK

1. Disconnect combination meter connector M24.
2. Check voltage between combination meter harness connector M24 terminals 3, 16 and ground.

Is the inspection result normal?
YES >> GO TO 3
NO >> Check harness for open between combination meter and fuse.
3.GROUND CIRCUIT CHECK

1. Turn ignition switch OFF.
2. Check continuity between combination meter harness connector M24 terminals 13, 23 and ground.

Initial Inspection and Diagnostic Overview|Page 5606 > < Initial Inspection and Diagnostic Overview|Page 5604