nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Lamps and Indicators - Engine > < Intake Manifold|Specifications|Page 2962
Page 3
background image

Fig. 6 Intake Manifold Bolt Loosening Sequence

Fig. 7 Intake Manifold Bolt Tightening Sequence

1. Release fuel system pressure as outlined under Technician Safety Information.
2. Remove timing belt as outlined under Timing Belt.
3. Drain coolant from engine and radiator.
4. Separate automatic speed control and accelerator control cable from intake manifold collector, Fig. 5.
5. Remove the following from the intake manifold collector:

a. Harness connectors for IACV-AAC valve.
b. Throttle position sensor and throttle position switch.
c. Ignition coil and power transistor.
d. EGRC-solenoid valve and IACV-air regulator.
e. On California models, EGR temperature sensor.
f.

Water and heater hoses.

g. PCV hose and righthand rocker cover.
h. Vacuum hoses for canister, brake master cylinder and pressure regulator.
i.

EGR tube, ground harness and air duct hose.

j.

Mark all vacuum hoses and electrical connectors for installation reference.

6. Remove fuel feed and fuel return hoses from injector tube assembly.
7. Disconnect all injector harness connectors.
8. Remove injector fuel tube assembly.
9. Disconnect coolant temperature switch and thermal switch harness connectors.

10. Remove water hose from thermostat housing.
11. Using loosening sequence, Fig. 6, remove intake manifold.
12. Reverse procedure to install. Using sequence shown in Fig. 7, tighten intake manifold bolts as follows:

a. Torque all bolts to 2.2-3.6 ft. lbs.
b. Torque all nuts to 2.2-3.6 ft. lbs.
c. Torque all bolts an additional 13-16 ft. lbs.
d. Torque all nuts an additional 13-16 ft. lbs.

Lamps and Indicators - Engine > < Intake Manifold|Specifications|Page 2962