nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Timing Component Alignment Marks > < Valve Clearance|Specifications|Page 2670
Page 2
background image

CAUTION:  Install identification letter at the end and top, "U" and "N", at each of proper positions. (Be careful of mis-installation between
intake and exhaust.)

6. Install selected valve lifter.
7. Install camshaft. 
8. Manually turn crankshaft pulley a few turns.
9. Make sure that the valve clearances for cold engine are within the specifications by referring to the specified values.

10. Installation of the remaining components is in the reverse order of removal.
11. Start the engine, and check for unusual noise and vibration.

Timing Component Alignment Marks > < Valve Clearance|Specifications|Page 2670