nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Emissions - MIL ON/DTC's P0442/P0448/P0455/P0456/P1446|Page 6159 > < Emissions - MIL ON/DTC's P0442/P0448/P0455/P0456/P1446|Page 6157
Page 4
background image

a. Remove burs from the edges with a file or sandpaper.

b. Clean the holes with solvent and allow to completely dry.

c. Apply / cover all bare metal with Zinc Rich primer (see Parts Information for Zinc Rich primer).

d. Alloy primer to dry - approximately 1 hour.

10. Prepare the bracket for installation as follows:

a. Assemble the collapsible nut, spacer nut, and bolt as shown in Figure 5.

b. Finger tighten the assembly in Figure 5.

c. Install / push the nut and bolt assembly into the bracket as shown in Figure 6.

11. Install the bracket on the frame rail (see Figure 7).

NOTE:  The collapsible nut will be a tight fit and may require tapping with a hammer to get it all the way in.

12. Torque the bolt to: 11.0 N.m (1.1 Kg-m, 96 in-lb)

NOTE:  

Emissions - MIL ON/DTC's P0442/P0448/P0455/P0456/P1446|Page 6159 > < Emissions - MIL ON/DTC's P0442/P0448/P0455/P0456/P1446|Page 6157