Pathfinder 4WD V6-4.0L (VQ40DE) (2006)
a. Remove burs from the edges with a file or sandpaper.
b. Clean the holes with solvent and allow to completely dry.
c. Apply / cover all bare metal with Zinc Rich primer (see Parts Information for Zinc Rich primer).
d. Alloy primer to dry - approximately 1 hour.
10. Prepare the bracket for installation as follows:
a. Assemble the collapsible nut, spacer nut, and bolt as shown in Figure 5.
b. Finger tighten the assembly in Figure 5.
c. Install / push the nut and bolt assembly into the bracket as shown in Figure 6.
11. Install the bracket on the frame rail (see Figure 7).
NOTE: The collapsible nut will be a tight fit and may require tapping with a hammer to get it all the way in.
12. Torque the bolt to: 11.0 N.m (1.1 Kg-m, 96 in-lb)
NOTE: