nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Starting System > < Diagram Information and Instructions|Page 8692
Page 1
background image

Alternator: Service and Repair

Removal and Installation

REMOVAL

1. Disconnect the negative battery terminal.
2. Remove the fan shroud.
3. Remove the drive belt.
4. Remove generator stay, using power tools.
5. Remove the generator upper bolt, using power tools.
6. Disconnect the generator harness connectors.
7. Remove the generator.

GENERATOR PULLEY INSPECTION

Perform the following.

-

Make sure that the generator pulley does not rattle.

-

Make sure that the generator pulley nut is properly tightened.

Generator pulley nut : 118 N.m (12.0 kg-m, 87 ft-lb)

INSTALLATION

Installation is in the reverse order of removal.

-

Install the generator and check tension of drive belt. Refer to "Tension Adjustment".

Terminal "1" nut : 10.8 N.m (1.1 kg-m, 8 ft-lb)

CAUTION:  Be sure to tighten terminal "1" nut carefully.

-

For this model, the power generation variable voltage control system that controls the power generation voltage of the generator has been adopted.
Therefore, the power generation variable voltage control system inspection should be performed after replacing the generator in order to ensure
that the system operates normally. Refer to SC-29, "Power Generation Variable Voltage Control System Inspection".  See: Testing and
Inspection/Symptom Related Diagnostic Procedures/Non-Trouble Code Procedures/Power Generation Variable Voltage Control System
Inspection 

Starting System > < Diagram Information and Instructions|Page 8692