nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Power Steering Oil Pressure Switch <--> [Power Steering Pressure Switch] > < To VIN # 350000|Page 3891
Page 3
background image

"RR O2 SEN-B1 (-B2)" should be below 0.54 V at least once when the "FUEL INJECTION" is -25%.

Without CONSULT

1. Start engine and drive vehicle at a speed of more than 70 km/h (43 MPH) for 2 consecutive minutes.
2. Stop vehicle with engine running.

3. Set voltmeter probes between ECM terminal 56 (right bank sensor signal) or 57 (left bank sensor signal) engine ground.
4. Check the voltage when racing up to 4,000 rpm under no load at least 10 times.

(depress and release accelerator pedal as soon as possible)
The voltage should be above 0.56 V at least once during this procedure.
If the voltage is above 0.56 V at step 4, step 5 is not necessary.

ECM Terminals And Reference Value

5. keep vehicle at idling for 10 minutes, then check the voltage. Or check the voltage when coasting from 80 km/h (50 MPH) in 3rd gear position

(M/T), "D" position with "OD" OFF (A/T).
The voltage should be below 0.54 V at least once during this procedure.

CAUTION:
-

Discard any heated oxygen sensor which has been dropped from a height of more than 0.5 m (19.7 in) onto a hard surface such as a concrete
floor; use a new one.

-

Before installing new oxygen sensor, clean exhaust system threads using Oxygen Sensor Thread Cleaner tool J-43897-18 or J-43897-12 and
approved anti-seize lubricant.

Power Steering Oil Pressure Switch <--> [Power Steering Pressure Switch] > < To VIN # 350000|Page 3891