nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Diagram Information and Instructions|Page 1345 > < Diagram Information and Instructions|Page 1343
Page 1
background image

EGR Temperature Sensor: Diagnostic Aids

Introduction

NOTE:

Trouble diagnoses indicates work procedures required to diagnose problems effectively. Observe the following instructions before diagnosing.

1.  Before performing trouble diagnoses, read the "Preliminary Check", the "Symptom Chart" or the "Work Flow".
2.  After repairs, re-check that the problem has been completely eliminated.
3.  Refer to Component Parts and Harness Connector Location for the Systems described in each section for identification/location of components and

harness connectors.

4.  Refer to the Circuit Diagram for quick pinpoint check. If you need to check circuit continuity between harness connectors in more detail, such as

when a sub-harness is used  

5.  When checking circuit continuity, ignition switch should be "OFF".
6.  Before checking voltage at connectors, check battery voltage.
7.  After accomplishing the Diagnostic Procedures and Electrical Components Inspection, make sure that all harness connectors are reconnected as

they were.

How to Follow Test Groups In Trouble Diagnosis

1. Work and diagnostic procedure

Start to diagnose a problem using procedures indicated in enclosed test groups.

2. Questions and required results.

Questions and required results are indicated in bold type in test group.
The meaning of are as follows:
a. Battery voltage -> 11 - 14V or approximately 12V
b. Voltage: Approximately 0 V -> Less than 1 V

3. Symbol used in illustration

Symbols included in illustrations refer to measurements or procedures. Before diagnosing a problem, familiarize yourself with each symbol. Refer
to "CONNECTOR SYMBOLS" and "Key to Symbols Signifying Measurements or Procedures".

4. Action items

Next action for each test group is indicated based on result of each question. Test group number is shown in the left upper portion of each test
group.

Key to Symbols Signifying Measurements or Procedures

Diagram Information and Instructions|Page 1345 > < Diagram Information and Instructions|Page 1343