nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

To VIN # 350000|Page 10270 > < To VIN # 350000|Page 10268
Page 7
background image

1. Apply grease to needle bearings before installing output shaft and input shaft.

Recommended grease:  MULTEMP PS No.2 

NOTE:  Apply the grease onto the bearings with your finger until the roller cage is packed, making the actual needle bearings difficult to see [2 - 3
grams (0.07 - 0.11 ounce) each]
.

2. Insert input shaft until it comes in contact with end face of gear box.

NOTE:  Output shaft cannot be installed before installing input shaft.

3. Apply MULTEMP PS No. 2 grease to output shaft thrust bearing.

4. Insert bearing race and thrust bearing to output shaft. 

NOTE:  Insert thrust bearing with roller side towards the bearing race as shown in the illustration.

5. Insert output shaft until it comes in contact with end face of gear box.

6. Insert new O-ring to output shaft.

CAUTION:

To VIN # 350000|Page 10270 > < To VIN # 350000|Page 10268