nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Timing Chain|Diagrams|Page 2705 > < Timing Chain|Diagrams|Page 2703
Page 6
background image

24. Remove crankshaft pulley with a suitable puller.
25. Remove aluminum oil pan.
26. Temporarily install the suspension member bolts and engine mounting nuts.
27. Remove CVTC covers.

-

Loosen bolts in numerical order as shown in the figure.

-

In the cover, the shaft is engaged with the center hole of the intake cam sprocket. Remove it straight out until the engagement comes off.

28. Remove front timing chain case bolts.

-

Loosen bolts in numerical order as shown in the figure.

29. Remove front timing chain case.

-

Do not scratch sealing surfaces.

Timing Chain|Diagrams|Page 2705 > < Timing Chain|Diagrams|Page 2703