Fig. 7 Driveshaft outer boot installation. Pathfinder & 4WD Pickup

2.

On all models, pack joints with suitable grease, then install boot and new large boot band on wheel side of shaft. Adjust boot length L, Fig. 7, to
3.82 inches on 1984-86 models or 3.78-3.86 inches on 1986-1/2-88 models.

3.

Install boot, new boot bands and slide joint housing onto driveshaft.

4.

Install driveshaft in suitable soft-jawed vise.

5.

Install spider assembly, referring to alignment mark made during disassembly.

6.

Caulk serrations of driveshaft equally at three places, then pack spider assembly with suitable grease. Do not caulk areas which were previously
caulked. Make sure that each caulking is applied to two serrations and is at least .04 inch wide.

7.

Install new large boot band, then the plug seal and plug.

8.

Caulk plug at three places using dummy bolts.

Fig. 8 Driveshaft inner boot installation. Pathfinder & 4WD Pickup

9.

Adjust boot length L, Fig. 8, to 4.06 inches, on 1984 models, 3.58 inches on 1985-86 carbureted models, 3.98 inches on 1986 fuel injected models
or 4.02-4.09 inches on 1986-1/2-88 models.

INSTALLATION

1.

Apply suitable grease to copper portion of wheel bearing support.

2.

Install spacer on driveshaft with concave side facing shaft.

3.

Reverse removal procedure to install shaft, then check endplay using suitable dial indicator.

4.

Select snap ring of correct thickness to adjust driveshaft endplay to .004-.012 inch.