nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Tune-up and Engine Performance Checks > < Timing Chain|Service and Repair
Page 2
background image

Fig. 7  Timing Chain Tensioner Installation

c. Adjust protrusion of chain tensioner spindle to 0 mm with slack side of chain guide, Fig. 13. 

6.

Apply sealant to upper and lower portions of front cover.

7.

Apply lithium grease to sealing lip of crankshaft oil seal.

8.

Install front cover, torquing M8 bolts to 7-12 ft. lbs. and M6 bolts to 2.9-7.2 ft. lbs.

9.

Apply suitable sealant to sealing point of cylinder head and install rubber plug.

10.

Install oil pan, torquing attaching bolts to 3.6-5.1 ft. lbs. on 1986-87 models, or 4.6-6.1 ft. lbs. on 1988 models.

11.

Install crankshaft pulley, torquing bolt to 87-116 ft. lbs.

12.

Install oil pump and distributor driving spindle in front cover, noting the following:

a. Torque attaching bolts to 8-11 ft. lbs.
b. Assemble oil pump and driving spindle, aligning driving spindle face with oil pump hole.

13.

Ensure No. 1 cylinder is set at TDC of its compression stroke and that distributor rotor is set at No. 1 cylinder spark position.

14.

Slowly rotate crankshaft to ensure pistons do not interfere with valves. Do not rotate crankshaft quickly or with force.

15.

Install, rocker cover, compressor idler pulley, power steering pump, idler pulley, power steering brackets, fan, pulley, drive belts and remaining
parts.

Tune-up and Engine Performance Checks > < Timing Chain|Service and Repair