nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Sensors and Switches - Transmission and Drivetrain > < Power Steering Pressure Switch|Description and Operation
Page 1
background image

Power Steering Pressure Switch: Testing and Inspection

1.

Disconnect P/S load switch terminal. Located near the top of the firewall on the R.H. side.

2.

Using an ohm meter check continuity of switch:

a. When turning steering wheel, with engine operating, continuity should exist.
b. Under any other condition continuity should not exist.

3.

Replace switch if it fails the above tests.

Sensors and Switches - Transmission and Drivetrain > < Power Steering Pressure Switch|Description and Operation