nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

All Technical Service Bulletins: > < Engine - Buzz/Whine Form Timing Chain Area|Page 1317
Page 4
background image

Figure 2.

NOTE

Leave the pins from Tool J-50246 in each tensioner until the timing chains are installed.

5. Install the new shoes to the tensioners with Tool J-50246 (See Figure 3).

^ Tighten the bolt until the shoe is fully seated.

CAUTION

Tighten the bolt no more then necessary.

6. Install the new secondary timing chains. Refer to the ESM as needed.

7. Reassemble the rest of the engine and vehicle. Refer to the ESM as needed.

^ Make sure all three (3) pins are removed before installing the front cover.

8. Install the battery cables, negative cable last.

9. Reprogram the radio presets.

10. Reset / initialize all applied systems i.e., power windows, clock, sunroof, etc.

All Technical Service Bulletins: > < Engine - Buzz/Whine Form Timing Chain Area|Page 1317