nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Control Module HVAC|Auto|Page 7794 > < Control Module HVAC|Auto
Page 1
background image

Control Module HVAC: Testing and Inspection
EATC Unit Check

EATC Unit Check

EATC Unit Check

Check power supply circuit for EATC with ignition switch ON.

1. Disconnect EATC control unit harness connector.
2. Connect voltmeter from harness side.
3. Measure voltage across terminal No. (23), (32) and body ground.

EATC Unit Check

EATC Unit Check

Check body ground circuit for EATC control unit with ignition switch OFF.

1. Disconnect EATC control unit harness connector.
2. Connect ohmmeter from harness side.
3. Check for continuity between terminal No. (30) and body ground.

Control Module HVAC|Auto|Page 7794 > < Control Module HVAC|Auto