nissan Workshop Repair Guides

Nissan Datsun Quest Minivan GXE V6-33L Auto Repair Manuals

Accumulator, A/T|Service and Repair|Page 7497 > < Engine Controls - ECM Programming Interruption Recovery|Page 7491
Page 1
background image

Accumulator: Service and Repair

Control Valve Assembly and Accumulators 
REMOVAL 

1. Drain ATF from transaxle.
2. Remove oil pan and gasket.

Always replace oil pan bolts as they are self-sealing bolts.

3. Disconnect A/T solenoid harness connector.

4. Remove snap ring from terminal cord assembly harness terminal body.
5. Remove terminal cord assembly harness from transmission case by pushing on terminal body.

Accumulator, A/T|Service and Repair|Page 7497 > < Engine Controls - ECM Programming Interruption Recovery|Page 7491