Rogue 2WD L4-2.5L (QR25DE) (2008)
b. Loosen mounting bolts in reverse order as shown in the figure, and remove electric throttle control actuator and gasket.
CAUTION:
^
Handle carefully to avoid any shock to electric throttle control actuator.
^
Never disassemble.
NOTE:
^
When removing only intake manifold, move electric throttle control actuator without disconnecting the water hose.
5. Disconnect harness, vacuum hose and PCV hose from intake manifold, and move them aside.
6. Remove intake manifold support.
7. Disconnect harness connector from tumble control valve motor. (For California)
8. Loosen mounting bolts and nuts in reverse order as shown in the figure, and remove intake manifold and gasket.
<---: Engine front
CAUTION: Cover engine openings to avoid entry of foreign materials.
NOTE: Disregard No. 6 when loosening.
9. Disconnect sub-harness from fuel injector.
10. Remove fuel tube and fuel injector assembly from intake manifold adaptor.
11. Remove EVAP canister purge volume control solenoid valve from intake manifold, if necessary.
INSTALLATION
Note the following, and install in the reverse order of removal.
Intake Manifold
^
If stud bolts were removed, install them and tighten to the specified torque below.
Torque: 9.4 Nm (0.96 kg-m, 83 in-lb)