nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

A/T - CVT/5 Speed Initialization Information|Page 6050 > < A/T - CVT/5 Speed Initialization Information
Page 2
background image

NOTE:

The procedure is not necessary when installing a new TCM.

1. Set the parking brake.

2. Connect CONSULT (II or III) to the vehicle and turn the ignition ON (engine OFF-not running).

3. Navigate CONSULT screens to Transmission.

4. Select and print the Calibration Data and save a copy.

NOTE:

For C-III; calibration data is under Special Functions.

5. Perform the EEPROM erase procedure as follows:

a. Select Transmission Self Diagnostic Results.

b. Shift the selector lever to R.

c. Press and hold the brake pedal.

d. Press and hold the accelerator pedal down about one-third, but no more than halfway. (The need here is to hold the throttle open just enough so the
closed throttle position signal is OFF and the wide open throttle position signal is also OFF.)

e. Press Erase.

f. Shift the selector lever to P.

g. Turn the ignition OFF.

h. Wait 5 seconds.

i. Turn the ignition ON.

6. Select and print the Calibration Data again.

7. Compare the values between the first and second Calibration Data prints.

^ The procedure is complete if the values are different.

5 Speed A/T equipped vehicles:

The TCM needs to be initialized when:

^ Replacing the Automatic Transmission (A/T) and not the TCM

^ Installing / swapping a TCM from another vehicle

NOTE:

The procedure is not necessary when installing a new TCM.

1. Connect CONSULT-II to the vehicle and turn the ignition ON.

2. Navigate the CONSULT screens to A/T.

3. Make sure the shift selector is in P.

4. Select WORK SUPPORT and than INITIALIZATION. 

^ Initialization is complete.

A/T - CVT/5 Speed Initialization Information|Page 6050 > < A/T - CVT/5 Speed Initialization Information