nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Timing Chain|Specifications|Page 2613 > < Timing Chain|Specifications|Page 2611
Page 7
background image

e. The following status indicates that the most advanced position is achieved: vane starts rotating on it own, then the sprocket also starts rotating

when camshaft is turned. When above status is achieved, this step is complete.
The most advanced position is confirmed when the stopper pin groove and lock pin breathing groove are aligned.

f.

Stop the air and insert stopper pin [approximately 3 mm (0.12 inch) dia., length of inserted part is approximately 15 mm (0.59 inch)] into
pinhole on camshaft sprocket to fix the most advanced position.

CAUTION: Load (spring reaction force) is not applied to stopper pin. Pin is easily detached. Therefore, secure it with vinyl tape to prevent detachment.

NOTE: In the figure, an Allen wrench [a/t 2.5 mm (0.098 inch), short part: approximately 20 mm (0.79 inch), long part: approximately 50 mm (1.97

inch)] is used for stopper pin as an example.

30. Remove the chain tensioner.

Remove in the following order.

a. Press the plate down and release the stopper tab.
b. Insert the plunger into the tensioner body until it stops.
c. Secure the plate by passing the stopper pin (such as a hard wire) through the plate hole and body hole. (Plunger is also secured.)
d. Remove the mounting bolts and remove the chain tensioner.

31. While holding the hexagonal part of the camshaft with a wrench, loosen the mounting bolts and remove the intake and exhaust camshaft sprockets.

Timing Chain|Specifications|Page 2613 > < Timing Chain|Specifications|Page 2611