nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Recall R0501 - Catalytic Converter Deterioration|Page 3021 > < Recall R0501 - Catalytic Converter Deterioration|Page 3019
Page 19
background image

18.

Check the CONSULT-II's "Charger Input" reading (see Figure 15).

NOTE:

^

"Battery Voltage" is the voltage level of CONSULT-II's battery.

^

"Charger Input" is the voltage level of the vehicle's battery. (It must be above 12 volts.)

NOTE:

The "Charger Input" reading MUST be above 12 volts (see Figure 15).

^

A reading above 12 volts confirms;

a.

The DLC-II is properly connected to the vehicle,

b.

The vehicle battery voltage is sufficient for ECM reprogramming, and

c.

CONSULT-II has a sufficient power supply to perform ECM reprogramming.

^

If the vehicles battery voltage ("Charger Input") is below 12 volts, one or more of the following may be the cause:

a.

The battery charger you hooked up in section 1 is not charging the battery (poor connection or it is not working).

b.

The DLC-II does not have a good connection to the vehicle (not straight).

c.

The DLC-II cable may have a malfunction (damaged wire or pins).

d.

The CONSULT-II Converter (J44200-50 / black box) is not working correctly (see Figure 12).

CAUTION:

^

Do not attempt ECU reprogramming if the vehicle's battery voltage is below 12 volts.

^

Permanent ECU damage can occur if the vehicle battery does not maintain the minimum voltage during ECU reprogramming.

^

If "Charger Input" is above 12 volts, power from the vehicle battery will keep CONSULT-II's power supply at the correct level during
reprogramming. (see Figure 15).

19.

Press [BACK] twice to get to the reprogramming screen.

Section 3: Perform ECM Reprogramming Using CONSULT-II Screen

Recall R0501 - Catalytic Converter Deterioration|Page 3021 > < Recall R0501 - Catalytic Converter Deterioration|Page 3019