nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

CAN System (Type 1)|Page 5028 > < CAN System (Type 1)|Page 5026
Page 1
background image

Information Bus: Testing and Inspection
CAN System (Type 2)

Work Flow

Work Flow

1. Print the data of "SELF-DIAG RESULTS" and "DATA MONITOR" for "ENGINE" displayed on CONSULT-II. Refer to EC-113 (QG18DE) or

EC-750 (QR25DE) for "ENGINE".  See: Testing and Inspection/Scan Tool Testing and Procedures

2. Attach the printed sheet of "SELF-DIAG RESULTS" and "DATA MONITOR" onto the check sheet. Refer to "CHECK SHEET".
3. Based on the data monitor results, put check marks onto the items with "UNKWN" or "NG" in the check sheet table. Refer to "CHECK SHEET".

NOTE:  If "NG" is displayed on "CAN COMM" for the diagnosed control unit, replace the control unit.

4. According to the check sheet results (example), start inspection. Refer to "CHECK SHEET RESULTS (EXAMPLE)".

Check Sheet

Check Sheet Results (Example)

CAN System (Type 1)|Page 5028 > < CAN System (Type 1)|Page 5026