Sentra L4-2.5L (QR25DE) (2003)
^
This will add the data you selected to the "File(s) Selected" list.
4.
Click on "Continue" and follow directions to perform "data transfer" (download) from ASIST into CONSULT-II.
Step Two: Preparation for Reprogramming ECM
1.
Connect a battery charger on trickle (low) charge setting to the vehicle's battery.
CAUTION:
For numbers 2 and 3 below: DO NOT connect the CONSULT-II AC power supply.
2.
Press [SUB MODE] (see Figure B) then:
a.
From the listed items, find and select [BATTERY CHARGE].
3.
Check the CONSULT-II's "Charger Input" reading (see Figure C).
NOTE:
^
"Battery Voltage" is the voltage level of CONSULT-II's battery.
^
"Charger Input" is the voltage level of the vehicle's battery. (It must be above 12 volts.)
Step Three: Reprogram the Vehicle ECM
Step Four: "Wrap-up" After Reprogramming is Finished
1.
Turn the ignition switch "OFF" and CONSULT-II "OFF".
2.
Wait more than 10 seconds, then: