nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Valve Clearance|Specifications|Page 3790 > < Valve Clearance|Specifications
Page 1
background image

Valve Clearance: Testing and Inspection

INSPECTION 

^

Perform this inspection as follows after removal, installation, or replacement of the camshaft or any valve related parts, or if there are any unusual
engine conditions due to changes in valve clearance over time (starting, idling, and/or noise).

1. Warm up the engine, then stop it.
2. Remove front RH engine undercover.
3. Remove the rocker cover.

4. Turn crankshaft pulley in normal direction (clockwise when viewed from front) to align TDC identification mark (without paint mark) with timing

indicator.

5. At this time, check that the both intake and exhaust cam noses of No. 1 cylinder face outside.

^

If they do not face outside, turn crankshaft pulley once more.

Black arrow - location

Table - location

6. By referring to the figure, measure valve clearances at locations marked X as shown in the table (locations indicated with black arrow in figure)

with a feeler gauge.
^

No. 1 cylinder compression TDC

Valve Clearance|Specifications|Page 3790 > < Valve Clearance|Specifications