nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Fundamentals and Basics > < Timing Chain|Removal|Page 1449
Page 2
background image

7. Install chain guide and chain tensioner.

Torque tensioner bolt to:

7 - 8 N-m (5.1 - 5.8 ft.lb.)

Torque chain guide bolts to:

13 - 19 N-m (9 - 14 ft.lb.)

Front Cover Sealant

8. Apply liquid gasket to front cover.

Front Cover Oil Seal

9. Install front cover.

CAUTION: Be careful not to damage cylinder head gasket.

CAUTION: Do not forget oil seal.

Torque 6mm bolts to:

7 - 8 N-m (5.1 - 5.8 ft.lb.)

Torque 8mm bolts to:

16 - 21 N-m (12 - 15 ft.lb.)

10. Install oil strainer securing bolt to main bearing beam.

Torque to: 7 - 8 N-m (5.1 - 5.8 ft.lb.)

11. Install oil pan.

Torque bolts to: 7 - 8 N-m (5.1 - 5.8 ft.lb.)

12. Install engine mounting.
13. Install any parts removed.

Fundamentals and Basics > < Timing Chain|Removal|Page 1449