Titan 2WD V8-5.6L (VK56) (2004)
^
Install the thermostat with the whole circumference of each flange part fit securely inside the rubber ring. (The example in the figure shows the
thermostat.)
^
Install the thermostat with the jiggle valve facing upwards.
Installation of water outlet pipe and heater pipe
^
First apply a neutral detergent to the O-rings, then quickly insert the insertion parts of the water outlet pipe and heater pipe into the installation
holes.
INSPECTION AFTER INSTALLATION
^
Check for leaks of the engine coolant using (commercial service tool) tool.
^
Start and warm up the engine. Visually make sure that there is no leaks of the engine coolant.