nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Valve Cover|Diagrams|Page 2927 > < Valve Cover|Diagrams
Page 1
background image

Valve Cover: Service and Repair

ROCKER COVER 

Removal and Installation 

REMOVAL 
1. Remove engine room cover with power tool. 
2. Remove air duct and resonator assembly (inlet). (for left bank only)
3. Move harness on upper rocker cover and its peripheral aside.
4. Remove electric throttle control actuator loosening bolts diagonally (for left bank only).
5. Remove ignition coil.
6. Remove PCV hose from PCV control valve.

7. Loosen bolts in reverse order shown using power tool.

CAUTION:  Do not hold the rocker cover by the oil filler neck (right bank).

Valve Cover|Diagrams|Page 2927 > < Valve Cover|Diagrams