nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Valve Guide > < Valve Cover|Diagrams|Page 2927
Page 3
background image

2nd step: 8.3 Nm (0.85 kg-m, 73 inch lbs.) 

CAUTION: Do not hold the rocker cover by the oil filler neck (right bank).

3. Install PCV hose with the following procedure:

^

Remove foreign materials from inside hose with compressed air using an air gun.

^

The inserted length is within 25 - 30 mm (0.98 - 1.18 inch) [Target: 25 mm (0.98 inch)].

4. Installation of the remaining components is in the reverse order of removal.

Valve Guide > < Valve Cover|Diagrams|Page 2927