nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Intake Manifold|Specifications|Page 3040 > < Intake Manifold|Specifications|Page 3038
Page 3
background image

9. Loosen bolts in reverse order of illustration to remove intake man if old with power tool.

CAUTION: Cover engine openings to avoid entry of foreign materials.

INSTALLATION 

Intake Manifold

Installation is in the reverse order of removal.
^

Tighten the intake manifold bolts in numerical order as shown.

^

Install the EVAP canister purge control solenoid valve connector with it facing front of engine.

^

Tighten the electronic throttle control actuator bolts of electric throttle control actuator equally and diagonally in several steps.

^

After installation perform procedure in "INSPECTION AFTER INSTALLATION".

^

Install water hose so that its overlap width for connection is between 27 mm (1.06 inch) and 32 mm (1.26 inch) (target: 27 mm 1.06 inch). 

Connecting Quick Connector of Fuel Tube 
Install quick connector as follows. (The steps are the same for quick connectors on both engine side and vehicle side except for the quick
connector cap.)

1. Make sure no foreign substances are deposited in and around tube and quick connector, and no damage to them.
2. Thinly apply new engine oil around the fuel tube from lip end to the spool end.

Intake Manifold|Specifications|Page 3040 > < Intake Manifold|Specifications|Page 3038