Titan 2WD V8-5.6L (VK56) (2004)
6. Measure valve clearances at locations marked "x" as shown in the table below (locations indicated with black arrow) with a thickness gauge.
NOTE: Firing order 1-8-7-3-6-5-4-2
^
No.1 cylinder compression TDC
6. Measure valve clearances at locations marked "x" as shown in the table below (locations indicated with black arrow) with a thickness gauge.
NOTE: Firing order 1-8-7-3-6-5-4-2
^
No.1 cylinder compression TDC