nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Valve Clearance|Specifications|Page 2498 > < Valve Clearance|Specifications|Page 2496
Page 1
background image

Valve Clearance: Testing and Inspection

Valve Clearance 
INSPECTION 

NOTE:  Perform the following inspection after removal, installation or replacement of camshaft or valve-related parts, or if there are unusual engine
conditions due to changes in valve clearance over time (starting, idling, and/or noise).

1. Warm up the engine. Then stop the engine.
2. Remove the engine cover.
3. Remove the battery cover.
4. Remove the air cleaner and air duct assembly.
5. Remove the RH bank and LH bank rocker covers using power tool. 

6. Turn the crankshaft pulley in the normal direction (clockwise when viewed from engine front) to align TDC identification notch (without paint

mark) with timing indicator.

7. At this time, make sure both the intake and exhaust cam noses of No. 1 cylinder (top front on LH bank) face outside.

^

If they do not face outside, turn crankshaft pulley once more.

8. Measure valve clearances at the locations marked "X" as shown in the table (locations indicated with black arrow).

^

<- : Engine front

^

<- (black): Measurable at No.1 cylinder compression top dead center

^

<- (white): Measurable at No. 3 cylinder compression top dead center

^

A: RH

^

B: LH

^

C: Exhaust

Valve Clearance|Specifications|Page 2498 > < Valve Clearance|Specifications|Page 2496