nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Exploded View|Page 1169 > < Exploded View
Page 1
background image

Camshaft: Service and Repair
Removal And Installation

CAMSHAFT

Removal and Installation

NOTE:
Do not remove the engine assembly to perform this procedure.

REMOVAL
1. Remove the RH bank and LH bank rocker covers. Refer to See: Cylinder Head Assembly/Valve Cover/Service and Repair/Removal And

Installation.

2. Obtain compression TDC of No. 1 cylinder as follows:

a. Turn the crankshaft pulley clockwise to align the TDC identification notch (without paint mark) with the timing indicator on the front cover.

b. At this time, make sure both intake and exhaust cam lobes of No. 1 cylinder (top front on LH bank) point outside.

-

If they do not point outside, turn crankshaft pulley once more.

3. Remove the intake valve timing control solenoid valve cover (RH) (A) and intake valve timing control solenoid valve cover (LH) (B) as follows:

a. Loosen and remove the bolts as shown.
b. Cut the liquid gasket and remove the covers using Tool.

Tool number : KV10111100 (J-37228)

CAUTION:
Do not damage mating surfaces.

Exploded View|Page 1169 > < Exploded View