nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Exploded View|Page 1411 > < Exploded View|Page 1409
Page 5
background image

NOTE:
-

The above figure shows the relationship between the mating mark on each timing chain and that of the corresponding sprocket, with the
components installed.

-

To install the timing chain and associated parts, start with those on the RH bank. The procedure for installing parts on the LH bank is omitted
because it is the same as that for installation on the RH bank.

1. Make sure the crankshaft key and camshaft dowel pin RH bank and camshaft dowel pin LH bank are facing in the direction shown.
2. Install the camshaft sprockets.

Exploded View|Page 1411 > < Exploded View|Page 1409