Titan 2WD V8-5.6L (VK56DE) Flex Fuel (2009)
Audible Warning Device: Component Tests and General Diagnostics
Combination Meter
POWER SUPPLY AND GROUND CIRCUIT
COMBINATION METER : Diagnosis Procedure
1.CHECK FUSES
Check for blown combination meter fuses.
Is the inspection result normal?
YES - GO TO 2
NO - If fuse is blown, be sure to eliminate cause of malfunction before installing new fuse.
2.POWER SUPPLY CIRCUIT CHECK
1. Disconnect combination meter connector M24.
2. Check voltage between combination meter harness connector M24 terminals 1, 8, 24 and ground.
Is the inspection result normal?
YES - GO TO 3
NO - Check harness for open between combination meter and fuse.
3.GROUND CIRCUIT CHECK