nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Seals and Gaskets, Engine > < Tightening Torques & Sequences|Page 3265
Page 4
background image

NOTE:  Recommended pulling force is 50 N (5.1 kg, 11.2 lbs.).

5. Install the quick connector cap on the quick connector joint (on engine side only).
6. Install the fuel hose and tube to hose clamps.
7. Refill the engine coolant. 

INSPECTION AFTER INSTALLATION 

^

After installing fuel tubes, make sure there is no fuel leakage at connections in the following steps.

^

Apply fuel pressure to fuel lines by turning ignition switch ON (with engine stopped). Then check for fuel leaks at connections.

^

Start the engine and rev it up and check for fuel leaks at the connections.

^

Perform procedures for "Throttle Valve Closed Position Learning" after finishing repairs. Refer to EC-83, "Throttle Valve Closed Position
Learning". See: Powertrain Management/Computers and Control Systems/Testing and Inspection/Programming and Relearning/Throttle Valve
Closed Position Learning

^

If electric throttle control actuator is replaced, perform procedures for "Idle Air Volume Learning" after finishing repairs. Refer to EC-85, "Idle
Air Volume Learning". See: Powertrain Management/Computers and Control Systems/Testing and Inspection/Programming and Relearning/Idle
Air Volume Learning

Seals and Gaskets, Engine > < Tightening Torques & Sequences|Page 3265