nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Timing Chain|Specifications|Page 3290 > < Timing Chain|Specifications|Page 3288
Page 4
background image

6. Remove the front cover.

a. Loosen and remove the bolts in the reverse of order shown.
b. Cut the liquid gasket and remove the covers using Tool.

Tool number: KV10111100 (J-37228)

CAUTION:  Do not damage mating surfaces.

7. Remove the front oil seal using suitable tool.

CAUTION:  Do not damage front cover.

8. Remove the oil pump drive spacer.

^

Hold and remove the flat space of the oil pump drive spacer by pulling it forward.

9. Remove the oil pump. 

10. Remove the chain tensioner on the LH bank using the following steps.

NOTE:  To remove the timing chain and associated parts, start with those on the LH bank. The procedure for removing parts on the RH bank is
omitted because it is the same as that for the LH bank.

a. Squeeze the return-proof clip ends using suitable tool and push the plunger into the tensioner body.
b. Secure the plunger using stopper pin.

^

Stopper pin is made from hard wire approximately 1 mm (0.04 inch) in diameter.

c. Remove the bolts and chain tensioner.

WARNING:  Plunger, spring, and spring seat pop out when (squeezing) return-proof clip without holding plunger head. It may cause
serious injuries. Always hold plunger head when removing.
 

Timing Chain|Specifications|Page 3290 > < Timing Chain|Specifications|Page 3288