nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Exploded View|Page 1196 > < Exploded View|Page 1194
Page 2
background image

4. Paint alignment marks on the RH bank (A) timing chain links (C) and LH bank (B) timing chain links (D) and align with the camshaft sprocket

alignment marks (E) and (F).

5. Remove the chain tensioner (LH) using the following steps.

WARNING:
Plunger, spring, and spring seat pop out when squeezing return-proof clip without holding plunger head. It may cause serious injuries.
Always hold plunger head when removing.

a. Squeeze return-proof clip ends using suitable tool and push the plunger into the tensioner body.
b. Secure plunger using stopper pin.

-

Stopper pin is made from hard wire approximately 1 mm (0.04 in) in diameter.
c. Remove the bolts and the chain tensioner.

NOTE:
-

Stop plunger in the fully extended position using return-proof clip (1) if stopper pin is removed.

-

Push the plunger (2) into the chain tensioner body while squeezing the return-proof clip (1). Secure it using stopper pin (3).

6. Remove the chain tensioner cover from the front cover using Tool.

Exploded View|Page 1196 > < Exploded View|Page 1194