nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Engine - Revised Upper Oil Pan/Timing Cover Service|Page 1464 > < Engine - Revised Upper Oil Pan/Timing Cover Service|Page 1462
Page 2
background image

REMOVAL

1. Disconnect battery negative terminal.

2. Remove the air dam and necessary undercovers if equipped.

3. Drain engine oil.

WARNING:
To avoid the danger of being scalded, never drain the engine oil when the engine is hot.

4. Remove the oil cooler.

5. Disconnect A/T cooler hoses from radiator.

6. Remove lower radiator hose and pipe assembly.

7. Remove RH and LH front wheel and tire using power tool.

8. Remove the power steering pump without disconnecting the power steering hoses and position aside.

9. Remove air duct and resonator assembly.

10. Remove upper radiator hose.

11. Disconnect coolant reservoir hose from radiator.

12. Remove crankshaft driven type cooling fan.

13. Disconnect the following connectors.

-

Harness ground

-

Power steering switch

-

A/C compressor

-

Oil pressure switch

14. Remove generator and generator bracket.

15. Remove A/C compressor without disconnecting the A/C pipes and position aside.

16. Remove front frame crossmember using power tool.

17. Remove the front final drive (4WD only).

18. Remove the steering gear.

19. Remove the oil pressure switch.

20. Remove the oil pan (lower). Using the following steps.

a. Remove the oil pan (lower) bolts in the reverse order as shown using power tool.

Engine - Revised Upper Oil Pan/Timing Cover Service|Page 1464 > < Engine - Revised Upper Oil Pan/Timing Cover Service|Page 1462