Titan 4WD V8-5.6L (VK56DE) Flex Fuel (2009)
2. Install A/T assembly harness connector to control valve with TCM.
3. Connect TCM connector.
4. Install new O-ring in A/T assembly harness connector.
CAUTION:
-
Do not reuse O-ring.
-
Apply ATF to O-ring.
5. Install A/T fluid temperature sensor 2 to bracket.
6. Install A/T fluid temperature sensor 2 (with bracket) to control valve with TCM. Tighten A/T fluid temperature sensor 2 bolt to the specified
torque. Refer to See: Service and Repair/Overhaul/Component.