nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Emissions - MIL ON/DTC's P0442/P0455/P0456/P1446|Page 3470 > < Emissions - MIL ON/DTC's P0442/P0455/P0456/P1446|Page 3468
Page 6
background image

a.

Remove burs from the edge with a file or sandpaper.

b.

Clean the hole with solvent and allow to completely dry.

c.

Apply / cover all bare metal with Zinc Rich primer (see Parts Information for Zinc Rich primer).

d.

Alloy primer to dry-approximately 1 hour.

8.

Prepare bracket for installation as follows:

a.

Assemble the collapsible nut, spacer nut, and bolt as shown.

b.

Finger tighten the assembly in Figure 4.

c.

Install / push the nut and bolt assembly into the bracket as shown in Figure 5.

Emissions - MIL ON/DTC's P0442/P0455/P0456/P1446|Page 3470 > < Emissions - MIL ON/DTC's P0442/P0455/P0456/P1446|Page 3468