nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Engine Controls - ECM Programming Interruption Recovery|Page 6158 > < Engine Controls - ECM Programming Interruption Recovery|Page 6156
Page 2
background image

SETTING UP:

1.

Install the Reprogramming Card into CONSULT-II.

^

The Reprogramming Software Card is the "orange" Card.

^

Use slot A-top slot (see Figure 1).

2.

Connect the AC power supply to CONSULT-II.

3.

Connect CONSULT-II to the ASIST PC with the special Ethernet cable (P/N 02002554 is printed on the cable).

A.

Connect one end to CONSULT-II at the "PC port".

B.

Connect the other end to the ASIST PC at the "Ethernet card" connection port.

4.

Confirm the CONSULT-II date and time are correctly set as follows:
(This is necessary to provide a valid print-out for warranty claims.)

A.

With the Reprogramming card in slot A, turn "ON" CONSULT-II.

B.

Touch [SUB MODE].

C.

Touch [SET DATE] (see Figure 2).

1)

If the date is not correct, touch the [MONTH], [DAY] or [YEAR] as needed. Then adjust it by using arrow keys. Once done, press
[SAVE], press [BACK], and go to step D.

2)

If the date is OK, press [BACK] and go to step D.

Engine Controls - ECM Programming Interruption Recovery|Page 6158 > < Engine Controls - ECM Programming Interruption Recovery|Page 6156