Cutlass Supreme RWD V8-307 50L (1988) Intake Manifold Component Info
6. Generator rear brace
7. With AC: compressor rear brace
8. Necessary electrical leads
9. RVB/ILC/EGR solenoid assembly and Idle Load Compensator and bracket assembly
10. EGR valve
11. Intake manifold bolts
Clean
^
Intake manifold and cylinder block mating surfaces
Install or Connect
^
Replace all gaskets.
1. Apply 1050026 sealer or equivalent to both sides of the manifold gasket,
2. Apply 1052915, GE 1673 or equivalent RTV sealer to the front and rear seals.
3. Gasket to cylinder heads
4. Seals to block
5. Intake manifold
6. Lubricate bolts with engine oil.
^
Bolts in sequence
^
20 N.m (15 lbs. ft.)
^
Then tighten to 54 N.m (40 lbs. ft.)
7. EGR valve. Tighten bolts to 27 N.m (20 lbs. ft.). Bend over lock tabs.
8. RVB/ILC/EGR solenoid assembly and Idle Load Compensator and bracket assembly
9. Electrical leads
10. With AC: compressor rear brace
11. Generator rear brace
12. Cables:
^
T.V. (and adjust)
^
Throttle
13. Hoses and pipes:
^
AIR (if equipped)
^
Vacuum
^
Fuel
^
Heater
^
Upper radiator
14. Air cleaner
15. Fill cooling system
16. Negative battery cable
Adjust
Tool required:
BT-7825 or J-23600B Belt Tension Gage
^
Drive belts.
Inspect
^
For leaks