Breeze L4-2.4L VIN X (2000)
Fig. 44
1. Slide new sealing boot to interconnecting shaft retaining clamp onto interconnecting shaft. Slide the outer C/V joint assembly sealing boot onto the
interconnecting shaft (Fig. 44). Seal boot MUST be positioned on interconnecting shaft so the raised bead on the inside of the seal boot is in
groove on interconnecting shaft.
2. Align splines on interconnecting shaft with splines on cross of outer C/V joint assembly and start outer C/V joint onto interconnecting shaft.
45
3. Install outer C/V joint assembly onto interconnecting shaft by using a soft-faced hammer and tapping end of stub axle (with nut installed) until
outer C/V joint is fully seated on interconnecting shaft (Fig. 45).