plymouth Workshop Repair Guides

Plymouth Workshop Service and Repair Manuals

Inner Tripod Joint Sealing Boot Replacement|Page 3855 > < Inner Tripod Joint Sealing Boot Replacement|Page 3853
Page 2
background image

6. Slide failed sealing boot off interconnecting shaft.
7. Thoroughly clean and inspect outer C/V joint assembly and interconnecting joint for any signs of excessive wear. If any parts show signs of excessive

wear, the driveshaft assembly will require replacement. Component parts of these driveshaft assemblies are not serviceable.

Installation

1. Slide new sealing boot to interconnecting shaft retaining clamp onto interconnecting shaft. Slide the outer C/V joint assembly sealing boot onto the

interconnecting shaft. Seal boot MUST be positioned on interconnecting shaft so the raised bead on the inside of the seal boot is in groove on
interconnecting shaft.

2. Align splines on interconnecting shaft with splines on cross of outer C/V joint assembly and start outer C/V joint onto interconnecting shaft.

3. Install outer C/V joint assembly onto interconnecting shaft by using a soft-faced hammer and tapping end of stub axle (with nut installed) until

outer C/V joint is fully seated on interconnecting shaft.

4. Outer C/V joint assembly must be installed on interconnecting shaft until cross of outer C/V joint assembly is seated against circlip on

interconnecting shaft.

5. Distribute 1/2 the amount of grease provided in seal boot service package (DO NOT USE ANN OTHER TYPE OF GREASE) into outer C/V joint

assembly housing. Put the remaining amount into the sealing boot.

Inner Tripod Joint Sealing Boot Replacement|Page 3855 > < Inner Tripod Joint Sealing Boot Replacement|Page 3853