plymouth Workshop Repair Guides

Plymouth Workshop Service and Repair Manuals

A/T/EGR - Surge & Deceleration Bucking Cresting Hills|Page 1747 > < A/T/EGR - Surge & Deceleration Bucking Cresting Hills|Page 1745
Page 4
background image

9.

Secure the 11" bleed-off hose and 6" carburetor nipple hose to the air switching vacuum hose and EGR vacuum hose (white stripe). Refer to
Figure 2 - the air switching hose and EGR hose should already be taped together in this area.

FIGURE 1 - Overlay Harness

A/T/EGR - Surge & Deceleration Bucking Cresting Hills|Page 1747 > < A/T/EGR - Surge & Deceleration Bucking Cresting Hills|Page 1745